TZ Darmstadt, Energy scheme infrastructure
TZ-Darmstadt Task
- Development of an efficient and flexible infrastructure scheme
- Efficient in terms of a full cost calculation
- Future-oriented in terms of using new technologies
- Ecological regarding a conservation of resources and a reduction of pollutant emission
- Flexible and oriented on demand in terms of site development
- Use of already existing infrastructure components
- Use of already existing resources
- Status analysis regarding age, load and expandability
- Analysis of trends for demand
- Derivation of an optimized supply scheme
- Provision of basics for specific decisions
Option 1)
Decentral heating and cooling
Option 2)
Central heating and decentral cooling
Option 3)
Central heating, decentral absorption chiller with combined heat and power and waste heat reuse
Option 4)
Central heating and cooling using already existing power station
Option 5)
Central heating and cooling using a new power station located near the center of load demand, combined heat and power
TZ-Darmstadt, already existing buildings
TZ-Darmstadt, heat supply after overall completion
Investment
Costs
Annual primary energy demand