TZ Darmstadt, Energy scheme infrastructure

TZ Darmstadt, Energy scheme infrastructure

TZ-Darmstadt Task

  • Development of an efficient and flexible infrastructure scheme
  • Efficient in terms of a full cost calculation
  • Future-oriented in terms of using new technologies
  • Ecological regarding a conservation of resources and a reduction of pollutant emission
  • Flexible and oriented on demand in terms of site development
  • Use of already existing infrastructure components
  • Use of already existing resources
  • Status analysis regarding age, load and expandability
  • Analysis of trends for demand
  • Derivation of an optimized supply scheme
  • Provision of basics for specific decisions


Option 1)
Decentral heating and cooling

Option 2)
Central heating and decentral cooling

Option 3)
Central heating, decentral absorption chiller with combined heat and power and waste heat reuse

Option 4)
Central heating and cooling using already existing power station

Option 5)
Central heating and cooling using a new power station located near the center of load demand, combined heat and power

TZ-Darmstadt, already existing buildings
TZ-Darmstadt, already existing buildings

TZ-Darmstadt, heat supply after overall completion
TZ-Darmstadt, heat supply after overall completion

Investment
Investment
Costs
Costs
Energy demand
Annual primary energy demand